Still under installation the new crane in Pompey dockyard. Work has been interrupted due the current Coronavirus situation and the team of Dutch engineers have gone home for the time being.
When they return they will fit the cantelever section on to the righthand side of the structure so that the crane can service the next dry dock as well as the one it straddles.
Access to the crane cab will be by an electric lift if we don't fancy the 63mtr climb up the ladder.


