Morning everyone
Picked up my 2.0 roadster on Sunday, what a cracking day to drive from Leicester to Aylesbury in a convertible! She needs a bit of work (sills) so figured I would join the forum to get some help and advice. Looks like an easy enough job, just a pig with having to remove every other panel first.
MOT is end of May, so although it should pass, I want them sorted by then, especially with a drive to Le Mans only a few weeks after.
Ideally I would replace the sills, but I assume this would involve getting the new ones stone protected and sprayed on delivery, and not sure how much the whole job will cost, having just spent 1400 on a motor I don't want to spend another ton of money immediately if I can help it.
Paul
Picked up my 2.0 roadster on Sunday, what a cracking day to drive from Leicester to Aylesbury in a convertible! She needs a bit of work (sills) so figured I would join the forum to get some help and advice. Looks like an easy enough job, just a pig with having to remove every other panel first.
MOT is end of May, so although it should pass, I want them sorted by then, especially with a drive to Le Mans only a few weeks after.
Ideally I would replace the sills, but I assume this would involve getting the new ones stone protected and sprayed on delivery, and not sure how much the whole job will cost, having just spent 1400 on a motor I don't want to spend another ton of money immediately if I can help it.
Paul